Refine Your Search

Topic

Search Results

Standard

Test Facility Shakedown and Commissioning

2023-05-17
WIP
AIR6364A
The paper will concentrate on the main engineering engine related aspects of the facility and will not necessarily contain information on the construction validation activities such as HVAC, electrical, facility fire system, waste water etc.
Standard

Numerical Modeling Techniques for Jet Engine Test Cell Aerodynamics

2019-03-21
CURRENT
AIR6355
This SAE Aerospace Information Report (AIR) has been written for individuals associated with ground level testing of turbofan and turbojet engines, and particularly for those who might be interested in investigating steady-state performance characteristics of a new test cell design or of proposed modifications to an existing test cell by means of numerical modeling and simulation. It is not the intent of this standard to provide specific test cell design recommendations, which are covered in the reference documentation.
Standard

Test Facility Shakedown and Commissioning

2017-11-29
CURRENT
AIR6364
The paper discusses in general terms the activities required to be undertaken or demonstrated during the establishment of the facility such as: the assessment checks prior to forwarding to the end users site for embodiment into the facility system the establishment of the facility such as trial installations of hardware, functionality checking of lifting transportation and access systems, centerline pull checks, pressure testing of fuel and air start systems, flushing of wet systems and electrical continuity checking. the commissioning of the facility such as instrumentation calibrations, engine starts, engine running, assessment of command and control system, assessment of DAS system, aerodynamic and acoustic surveys. The paper will concentrate on the main engineering engine related aspects of the facility and will not necessarily contain information on the construction validation activities such as HVAC, electrical, facility fire system, waste water etc.
Standard

Gas Turbine Engine Fuel Nozzle Test Procedures

2013-12-10
CURRENT
ARP4865A
The intent of this SAE Aerospace Recommended Practice (ARP) is to define and recommend to the Aerospace Industry standardized test procedures for establishing fuel nozzle operating performance including types of tests, controlled and measured parameters, and test configurations.
Standard

GAS TURBINE ENGINE FUEL NOZZLE TEST PROCEDURES

2007-11-15
HISTORICAL
ARP4865
The intent of this SAE Aerospace Recommended Practice (ARP) is to define and recommend to the Aerospace Industry standardized test procedures for establishing fuel nozzle operating performance including types of tests, controlled and measured parameters, and test configurations.
Standard

Physical Modeling Techniques for Jet Engine Test Cell Aerodynamics

2023-11-09
WIP
AIR4827C
This SAE Aerospace Information Report (AIR) has been written for individuals associated with ground level testing of turbofan and turbojet engines and particularly for those who might be interested in investigating the performance characteristics of a new test cell design or of proposed modifications to an existing test cell by means of a scale model test.
X